Homewood Suites, Cape Canaveral

Full Interior and Exterior Renovations

  • Completed repairs on 43 ceilings.
  • Ensured protection of FF&E, walls, and flooring.
  • Removed existing texture from entire ceilings.
  • Primed rough concrete deck.
  • Prepared ceilings to achieve smoothness on the concrete deck.
  • Primed the entire ceiling.
  • Applied knockdown texture.
  • Painted the entire ceiling.
  • Conducted cleanup and reinstated all FF&E.
  • 51 gallons of paint
  • 295 kg of joint compound
  • 65 gallons of primer

Featured Projects

Discover Our Passion for Hotel Renovations

Have a project in mind?